The construction of JiBOM management system incorporated the advanced management practices from Geely BOM 3.0. The main business areas of the Phase I project include:
● Product master data management: Integrating the product structure standards from Geely's cooperative R&D project, and combining it with Jiyue’s in-house business requirements, thus establishing a set of product structure standards that can support cooperative R&D business without disrupting its product structure standards for independent R&D.
● Parts management: Customized a coding system to meet the needs of Geely's various research institutes for part coding, part design, and manufacturing modes, thus ensuring compatibility with Geely's business.
● Engineering configuration management: Defining engineering configuration tables in a fully configured mode, while self-developing a unique configuration management system based on Jiyue’s specific business requirements.
● BOM management: Integrate Jiyue's product structure system and Geely's product structure standards into one BOM, and integrated different software management modes of Jiyue and Geely into JiBOM
● Change Management: Changes take effect immediately after approval. Change contents in BOM are transmitted to related systems to ensure efficient and unified data information.